Skip to content

1.5 Grounding Architecture

Multi-point grounding strategy with high-current grounds to frame rails and low-current grounds to firewall/chassis points.

Overview

Ground Point Type Location Capacity Notes
START battery (-) Battery Terminal Driver wheel well 7 connections See START Battery Distribution
AUX battery (-) Battery Terminal Passenger wheel well 5 connections See AUX Battery Distribution
Engine Bay Ground Bus Blue Sea 2107 PowerBar Firewall (engine bay) 8 studs (600A) See Engine Bay Ground Bus
Firewall Stud Bus Blue Sea 2105 MaxiBus Firewall (cabin side) 14 terminals (250A) See Firewall Stud Bus
SwitchPros Ground Bus Blue Sea 2105 MaxiBus Near SwitchPros controller 14 terminals (250A) See SwitchPros Ground Bus

Ground Bus Bars

Testing Requirements

Test Point Max Voltage Drop Test Conditions
Battery to frame rail (front) <0.1V Engine @ 2000 RPM, DC voltmeter
Battery to frame rail (rear) <0.1V Engine @ 2000 RPM, DC voltmeter
START battery to AUX battery <0.05V Engine @ 2000 RPM, DC voltmeter

Installation & Testing: See Section 1 Installation Checklist