Section 1: Power Systems - Installation Checklist¶
Organized by installation order for efficient build workflow.
Phase 1: Foundations¶
Battery Compartments¶
- Install Odyssey PC1500 (START) in driver wheel well with access panel
- Build enclosed compartment in passenger wheel well with access panel (AUX)
- Install Barnes 4WD battery box (Group 24) in passenger wheel well - powdercoat before install
- Install Dakota Lithium 135Ah LiFePO4 (AUX) in Barnes battery box
Grounding System¶
Ground Bus Bars:
- Mount Engine Bay Ground Bus (Blue Sea 2107 PowerBar, 600A) on firewall (engine bay side) near PMU
- Mount Firewall Stud Bus (Blue Sea 2105 MaxiBus, 250A) on firewall (cabin side)
- Mount SwitchPros Ground Bus (Blue Sea 2105 MaxiBus, 250A) near SwitchPros controller
Frame Rail Grounds:
- Confirm front frame rail ground point location (clean metal-to-metal)
- Confirm rear frame rail ground point location (clean metal-to-metal)
- Confirm 2/0 AWG: START battery- → Engine Bay Ground Bus Stud 1
- Confirm 2/0 AWG: Engine Bay Ground Bus Stud 2 → Engine block
- Confirm 2/0 AWG: Engine Bay Ground Bus Stud 3 → Front frame rail
- Confirm 2/0 AWG: AUX battery- → Rear frame rail (~3 ft)
- Confirm 4 AWG: Firewall Stud Bus Stud 1 → Chassis ground (~2 ft)
- Confirm 1/0 AWG: SwitchPros Ground Bus Stud 1 → Chassis/frame rail
Battery Ground Reference:
- Confirm 1/0 AWG: Engine Bay Ground Bus Stud 4 → AUX battery- (5-6 ft, 75A capacity)
Ground Testing:
- Verify <0.1V drop: START battery- to front frame rail (engine @ 2000 RPM)
- Verify <0.1V drop: AUX battery- to rear frame rail (engine @ 2000 RPM)
- Verify <0.05V drop: START battery- to AUX battery- (engine @ 2000 RPM)
- Verify <0.05V drop: START battery- to AUX battery- (BCDC charging @ 25A)
- Verify <0.2V drop: START battery- to AUX battery- (winch operation @ 400A)
- Verify ground bus stud torque: 100-120 in-lb (3/8"-16 studs on PowerBar)
Phase 2: Power Distribution¶
START Battery Circuit Breakers¶
Circuit Breakers (mount within 7" of battery):
- Mount Mechanical Products 174-S2-250-2 250A CB (PMU main power)
- Mount Mechanical Products 174-S2-080-2 80A CB (BCDC input)
START Battery Positive Wiring:
- Confirm 2/0 AWG: START battery+ → 250A CB → PMU main power (~7 ft, temp-derated for 60°C)
- Confirm 4 AWG: START battery+ → 80A CB → BCDC input (~6 ft)
PMU Ground Reference:
- Confirm PMU Pin 25 connected to Engine Bay Ground Bus Stud 5 (per harness, <100mA logic/CAN reference)
Direct Battery Connections (No Circuit Breaker):
- Confirm ECM power/ground connected directly to START battery terminals (per Cummins harness)
- Confirm grid heater relay powered from START battery+ (via integrated fusible link)
- Confirm grid heater ground connected directly to START battery-
Radio Grounds (RF Noise Isolation):
- Confirm 10 AWG: GMRS Radio ground → START battery- (route through floor/frame, ~8 ft)
- Confirm 10 AWG: Ham Radio ground → START battery- (route through floor/frame, ~8 ft)
- Confirm 10 AWG: STX Intercom ground → START battery- (route through floor/frame, ~8 ft)
Testing:
- Verify PMU main power always on (via 250A CB)
- Verify voltage drop across main power cables under load (<3% at 60°C)
- Verify ground resistance: Engine Bay Ground Bus to battery- (<0.1Ω)
AUX Battery Bus Bars & Circuit Breakers¶
CONSTANT Bus Bar:
- Mount CONSTANT bus bar (Blue Sea 2107 PowerBar, 600A) in passenger wheel well
- Confirm 1/0 AWG: AUX battery+ → CONSTANT bus (~3 ft)
Circuit Breakers (mount within 7" of battery):
- Mount Blue Sea 187-150 150A CB (SwitchPros RCR-Force 12)
- Mount Blue Sea 187-150 150A CB (SafetyHub 150)
- Mount Mechanical Products 174-S2-100-2 100A CB (BODY PDU)
CONSTANT Bus Wiring:
- Confirm 2 AWG: CONSTANT bus → 150A CB → SwitchPros RCR-Force 12 (~2 ft)
- Confirm 2 AWG: CONSTANT bus → 150A CB → SafetyHub 150 (~2 ft)
- Confirm 2 AWG: CONSTANT bus → 100A CB → BODY PDU (~12 ft through firewall)
Direct AUX Battery Connections (No Circuit Breaker):
- Confirm 1/0 AWG: AUX battery+ → Winch positive (13 ft one-way, direct connection per WARN spec)
- Confirm 1/0 AWG: AUX battery- → Winch negative (13 ft one-way, matches positive path)
- Confirm 4 AWG: AUX battery- → Fusion Apollo amplifier ground (~8-10 ft)
BCDC Alpha 50 Installation¶
- Mount BCDC in passenger wheel well (water-protected, LED visibility access)
- Confirm 4 AWG: START battery+ → 80A CB → BCDC input (red terminal, M8, ~6 ft)
- Confirm 4 AWG: BCDC output (brown terminal, M8) → AUX battery+
- Confirm 4 AWG: BCDC negative (black terminal, M8) → AUX battery-
- Confirm 18 AWG: Ignition signal (blue spade terminal) → PMU ignition sense tap
Battery Temperature Sensor (REQUIRED for LiFePO4):
- Install BCDC temp sensor ring terminal on AUX battery positive terminal bolt
- Route sensor cable to BCDC (short run - both in passenger wheel well)
- Plug sensor into BCDC temperature sensor port (2-pin connector, polarity reversible)
BCDC Configuration & Testing:
- Configure Green Power Priority via RedArc app
- Test jump start assist function
- Verify BCDC LED status indicates proper charging mode
Alternator¶
- Install 270A alternator (Premier Power Welder HO-C28)
- Confirm 2/0 AWG: Alternator output → START battery+ (shortest path, ~8 ft)
- Confirm alternator case grounded through engine block mounting
Phase 3: Controllers - Physical Installation & Main Power¶
PMU24 Physical Installation¶
- Mount PMU on firewall or inner fender (accessible for LED/USB diagnostics)
- Confirm PMU ground reference Pin 25 connected to Engine Bay Ground Bus Stud 5
SafetyHub 150 Physical Installation¶
- Mount SafetyHub 150 in passenger wheel well (co-located with AUX battery and circuit breakers)
- Confirm 2 AWG: CONSTANT bus → 150A CB → SafetyHub input
- Verify SafetyHub internal ground bus connected to SwitchPros Ground Bus
BODY PDU Physical Installation¶
- Verify all circuit breakers and relays functional in LR-2 unit
- Replace 24V relays (K40, K42, K53) with 12V relays (determine part numbers)
- Mount LR-2 on firewall (body side, passenger side)
- Confirm 2 AWG: CONSTANT bus → 100A CB → BODY PDU power studs (~12 ft)
- Confirm 14 AWG: BODY PDU ground → Firewall Stud Bus Terminal 3 (relay coil/logic only)
- Create custom wiring harnesses to adapt J301-J306 military connectors to civilian loads
- Route heated seat dash switches to LR-2 relay control inputs (K21, K22)
- Label repurposed circuits on LR-2 enclosure (match CB positions to new functions)
SwitchPros RCR-Force 12 Physical Installation¶
- Mount SwitchPros controller
- Confirm 2 AWG: CONSTANT bus → 150A CB → SwitchPros power input
- Confirm SwitchPros ground connected to SwitchPros Ground Bus Terminal 1 (14 AWG)
SwitchPros Custom Harness Note:
Custom Delphi Harness Design
Create 12 custom 2-pin Delphi harnesses at SwitchPros:
- Each SwitchPros output → 2-pin Delphi plug (power + ground combined)
- Each light → matching 2-pin Delphi plug
- Back of SwitchPros: ~12 Delphi connectors for plug-and-play lighting
- Eliminates individual wire routing - each light is single plug connection
Phase 4: Integration & Wiring¶
Firewall Bulkhead Connector¶
Deutsch HDP20 Installation:
- Drill 1.5" diameter hole in firewall for bulkhead connector
- Mount HDP24-24-21PE-L015 receptacle (flange mount, engine side)
- Assemble HDP26-24-21SE plug (cabin side)
- Crimp size 16 contacts (0460-202-16141 pins, 0462-201-16141 sockets) for 17 wires
- Install sealing plugs (114017/114018) in unused cavities
- Verify IP67/IP68 seal engagement with bayonet coupling
Pin Assignment Verification:
- Confirm Pin 1-6 (Engine→Cabin): Radio power (3), PMU lighting outputs (3)
- Confirm Pin 7-17 (Cabin→Engine): CT4 outputs (4), switch signals (5), winch control (2)
- Install ferrite chokes on radio power leads at radio end (RF mitigation)
Ignition Signal Distribution¶
- Confirm 18 AWG: Ignition RUN → Deutsch connector Pin 12 → PMU Pin 7
- Confirm ignition signal bus bar splits to: CT4, SwitchPros, Fusion Radio, BCDC
- Verify total ignition signal current <500mA for all taps
PMU Input Wiring¶
- Confirm 18 AWG: Ignition RUN → PMU Pin 7 (dedicated wire, not from bus bar)
- Confirm horn button → PMU In 1 (via Deutsch connector Pin 11)
- Confirm brake pedal switch → PMU In 2 (via Deutsch connector Pin 13)
- Confirm reverse signal → PMU In 3 (Turbolamik aux output, Reverse gear)
- Confirm Boomerang fob present → PMU In 4 (via firewall pin TBD)
- Confirm push-button → PMU In 5 (via Deutsch connector Pin 15)
- Confirm Turbolamik P/N → PMU In 6 (engine bay, direct from TCU)
- Confirm A/C request → PMU In 9 (via Deutsch connector Pin 14)
- Confirm CT4 SW3 (headlight status) → PMU In 7 (tap on engine bay side of connector)
PMU Output Wiring¶
High-Current Outputs (Combined):
- Confirm iBooster main power → OUT1+10 combined (46A @ 40°C capacity, non-adjacent)
- Confirm radiator fan → OUT2+3+4 combined (75A total capacity)
25A Outputs:
- Confirm HVAC blower → OUT5 (20A max) - ground: factory HVAC ground
- Confirm GMRS Radio → OUT6 (15A) - ground: direct to START battery-
- Confirm oil cooler fan → OUT7 (15A) - ground: Engine Bay Bus Stud 8
- Confirm PS cooler fan → OUT8 (15A) - ground: Engine Bay Bus Stud 8
- Confirm Dakota Digital system → OUT9 (25A) - ground: Firewall Stud Bus T4-5
15A Outputs:
- Confirm wipers (WS-51C) → OUT11 (15A) - ground: Firewall Stud Bus T2
- Confirm Ham Radio → OUT12 (13A) - ground: direct to START battery-
- Confirm CT4 → OUT13 (9A, CONSTANT) - ground: Firewall Stud Bus T1
- Confirm ADU7 Display → OUT14 (2A) - ground: A-pillar
- Confirm winch contactor trigger → OUT15 (1A) - control signal only
7A Outputs:
- Confirm A/C clutch → OUT17 (5A) - ground: factory A/C ground
- Confirm horn → OUT18 (5.4A) - ground: Engine Bay Bus Stud 6
- Confirm iBooster ignition signal → OUT19 (5A) - ground: Engine Bay Bus Stud 7
- Confirm STX Intercom → OUT20 (5A) - ground: direct to START battery-
- Confirm brake lights → OUT21 (3A) - ground: SwitchPros Ground Bus T4
- Confirm reverse lights → OUT22 (5A) - ground: SwitchPros Ground Bus T4
- Confirm DRL/parking → OUT23 (2A) - ground: SwitchPros Ground Bus T5
- Confirm Ignition Authorize → OUT24 (5A) - drives ECM ignition relay + keyless crank chain
PMU CAN Bus Integration¶
- Confirm J1939 CAN High T-tap → PMU Pin 23/24 (18-20 AWG twisted pair, <12" stub)
- Confirm J1939 CAN Low T-tap → PMU Pin 36/37 (18-20 AWG twisted pair, <12" stub)
- Disable PMU internal CAN termination in software (bus already terminated at ECM + harness end)
- Verify 60Ω resistance across CAN High/Low at ECM connector (harness disconnected, ignition off)
- Configure PMU to read J1939 SPNs: 100 (oil pressure), 110 (coolant temp), 175 (oil temp), 190 (RPM)
BODY PDU Circuit Wiring¶
- Confirm Fusion Radio memory → CB30 (15A, 14 AWG, CONSTANT)
- Confirm USB ports → CB48 (20A, 14 AWG, CONSTANT) - 2× Powerwerx PanelUSB-75W (7.5A fuse ea)
- Confirm WolfBox camera → CB39 (10A, 16 AWG, CONSTANT)
- Confirm driver heated seat → CB45 (15A, 14 AWG) via relay K21 - 5A peak, 2A sustained
- Confirm passenger heated seat → CB42 (20A, 14 AWG) via relay K22 - 5A peak, 2A sustained
- Confirm cargo lights → CB20 (10A, 16 AWG) - switch on wheel well top
- Confirm winch control → CB43 (10A, 18 AWG) - dash rocker + remote parallel control
Verification:
- Verify Fusion radio current draw matches fuse ratings
- Verify WolfBox model and 10A fuse adequate
- Verify all BODY PDU load grounds route to individual load ground points (high-side switching)
SafetyHub Circuit Wiring¶
- Confirm ARB compressor motor 1 → MIDI-1 (60A, 6 AWG, ~12 ft to under passenger seat)
- Confirm ARB compressor motor 2 → MIDI-2 (60A, 6 AWG, ~12 ft to under passenger seat)
- Confirm winch contactor trigger → ATC-1 (15A, 14 AWG, ~13 ft to front bumper)
Solar Panel Installation¶
- Install Cascadia 4x4 80W panel on hood per manufacturer instructions (SolarClasp adhesive)
- Route wiring: Hood → Firewall → BCDC (~10-12 ft, MC4 connectors)
- Confirm solar positive → BCDC solar input (yellow terminal)
- Confirm solar negative → Chassis ground (NOT BCDC negative)
- CRITICAL: Verify polarity before connection - reverse polarity damages BCDC
Optional Overvoltage Protection (cold weather):
- Mount overvoltage relay module near BCDC (weatherproof location)
- Configure overvoltage threshold: 47V disconnect, 44V reconnect
- Configure trip delay: 1-2 seconds (ignore brief spikes)
- Test threshold settings before final installation
Solar Testing:
- Monitor BCDC LED in daylight to verify solar charging
- Verify solar input voltage within range (9-48V) at operating temperature
Phase 5: Testing & Programming¶
PMU Programming¶
Output Combining:
- Configure iBooster combining (OUT1+10, non-adjacent terminals)
- Configure radiator fan combining (OUT2+3+4, PWM variable speed)
Logic Programming:
- Program DRL auto-off when headlights active (In 7 CT4 SW3 → OUT23 disable)
- Program A/C clutch engagement logic (In 9 → OUT17)
- Program horn activation (In 1 → OUT18)
- Program brake light activation (In 2 → OUT21)
- Program reverse light activation (In 3 → OUT22)
- Program oil cooler fan based on SPN 175 (220-230°F hysteresis) → OUT7
- Program PS cooler fan based on SPN 110 (210-220°F hysteresis) → OUT8
- Configure sequential load startup delays (0.5s, 1.0s, 1.5s)
Backup:
- Export/backup configuration (.pmu format) to git repository
- Print critical logic (DRL, fan control) for emergency recovery
PMU Testing¶
- Verify J1939 communication and data accuracy (SPNs 100, 110, 175, 190)
- Test DRL auto-off logic (verify OUT23 disables when headlights active)
- Test A/C clutch engagement (verify OUT17 activates with In 9)
- Test CAN-based fan controls at threshold temps (OUT7, OUT8)
- Test sequential load startup timing
- Verify LED diagnostics show correct states
- Verify iBooster CONSTANT power (OUT1+10 always on)
Ground Bus Testing¶
- Verify Engine Bay Ground Bus stud torque: 100-120 in-lb
- Verify Firewall Stud Bus terminal torque per Blue Sea spec
- Verify SwitchPros Ground Bus terminal torque per Blue Sea spec
- Verify all ground bus connections have clean metal-to-metal contact
System Integration Testing¶
- Verify all PMU outputs operate correctly (test each output individually)
- Test all BODY PDU circuits (CB30, CB48, CB39, CB45, CB42, CB20, CB43)
- Test SafetyHub circuits (MIDI-1/2 ARB, ATC-1 winch trigger)
- Verify SwitchPros Delphi connectors and outputs
- Verify Deutsch bulkhead connector seal integrity
- Final voltage drop measurements under load (<3% at operating temp)
- Final ground resistance verification (<0.1Ω all paths)
Reference Documentation¶
Power Systems:
- Batteries - START (Odyssey PC1500) and AUX (Dakota Lithium 135Ah) specifications
- BCDC Alpha 50 - DC-DC charger installation and configuration
- Solar Charging - Cascadia 80W panel and overvoltage protection
- START Battery Distribution - Driver wheel well connections
- AUX Battery Distribution - Passenger wheel well connections
Ground Bus Bars:
- Engine Bay Ground Bus - Blue Sea 2107 PowerBar stud assignments
- Firewall Stud Bus - Blue Sea 2105 MaxiBus terminal assignments
- SwitchPros Ground Bus - Blue Sea 2105 MaxiBus terminal assignments
PMU:
- PMU Overview - Product specifications
- PMU Inputs - Input configuration and CAN bus
- PMU Outputs - Output assignments and ground locations
- PMU Programming - Logic configuration
Distribution:
- BODY PDU - LR-2 circuit breaker and relay assignments
- SafetyHub 150 - ARB and winch fuse assignments
- Firewall Ingress - Deutsch HDP20 connector pinout